Client: Peak Group
Industry: Construction
Location: Doncaster, South Yorkshire
Completion Year: 2025
Following the successful redesign of Peak’s head office, District Four were asked to reimagine their hospitality box at Doncaster Rovers Stadium.
They wanted their box to reflect the professionalism and identity of their brand. The space was regularly used to host clients and partners on matchdays, but the existing setup didn’t represent who they were as a business. The brief was to completely refresh the room, aligning it with Peak’s brand and creating a space that made the right impression from the moment guests walked in.
alignment.
We took inspiration from Peak’s visual identity, using their logo geometry and tones to anchor the space. The goal was a strong, cohesive look that tied directly back to their company branding.
flow.
The furniture layout was reworked to encourage social interaction while keeping the space open and accessible. The high-table arrangement gives the room presence and flexibility for matchdays or meetings.
selection.
Every finish and fixture was chosen for its visual impact and practicality. We balanced aesthetics with cost-efficiency, ensuring the design felt refined and durable without unnecessary spend.
touches.
Subtle wall graphics, framed team shirts and a layered palette add depth and texture creating a complete, considered environment that feels consistent with Peak’s professional image.
The finished space has transformed the hospitality box into a confident, brand-led environment that feels purpose-built for client hosting and team days.
Working within a tight budget, we achieved maximum visual impact through thoughtful design and execution, delivering a space that now feels distinctly Peak.