Skip to content
District Four Design
District Four Design
Contact
Refurbished executive box at Doncaster Rovers Stadium for Taylor Stevenson
Work/ Executive Box Refurbishment at Doncaster Rovers Stadium

Executive Box Refurbishment
at Doncaster Rovers Stadium.

CLIENT
Taylor Stevenson
INDUSTRY
Recruitment
LOCATION
COMPLETION YEAR
2026
THE CHALLENGE

A borrowed box that didn't feel like their brand.

After successfully delivering Taylor Stevenson's office refurbishment, they asked us to transform their executive box at Doncaster Rovers Stadium ahead of the new football season.

The existing hospitality suite had originally been designed for another occupier. While functional, it didn't reflect Taylor Stevenson's brand or the impression they wanted to make when hosting clients and guests.

The project also presented several design challenges. Despite its compact footprint, the space needed to comfortably accommodate up to 20 people, incorporate practical storage for coats and belongings and work around the existing flooring.

Our goal was to create a bold, premium hospitality environment that felt unmistakably Taylor Stevenson while making the most of the existing layout and finishes.

Colour-drenched interior of the refurbished executive box
OUR APPROACH

Four moves that transformed the space.

01
Smarter seating layout

Instead of relying on one style of seating, we introduced a combination of:

Modular seatingLightweight moveable pouffesA high table with plush bar stoolsNew stools to complement the existing breakfast bar

02
Colour-drenched interior

The walls and architectural features were colour drenched to create a much stronger visual impact and reinforce the Taylor Stevenson's brand. This also gives the room a more premium, contemporary atmosphere that immediately distinguished it from its previous appearance.

03
Layered feature lighting

New decorative wall lights were introduced alongside concealed LED strip lighting around the perimeter of the room. This combination created a softer ambient glow for evening hospitality while giving the suite a far more premium feel than standard overhead lighting alone.

04
Feature panelling

Custom MDF wall panelling was installed and finished in black, introducing texture, depth and architectural interest while reinforcing the darker design palette.

Feature lighting and panelling detail in the executive box
THE OUTCOME

An extension of the Taylor Stevenson brand.

The completed refurbishment delivered exactly what the client had hoped to achieve.

Instead of feeling like a borrowed hospitality suite, the executive box became an extension of the Taylor Stevenson brand.

The finished space now provides:

> A hospitality suite designed specifically around Taylor Stevenson’s identity
> Flexible seating for up to 20 guests
> Improved lighting that creates a stronger matchday atmosphere
> Better use of space through varied seating options
> Practical storage for coats and belongings
> Completion on schedule ahead of the new football season

The project was delivered within the planned programme, with furniture arriving on time and installation completed with very few outstanding items.

WHY THIS PROJECT MATTERS

Making existing space work harder.

Many hospitality refurbishments aren't about creating more space.

They're about making existing space work harder.

This project demonstrates how thoughtful interior design, carefully planned furniture layouts and considered lighting can completely transform a relatively small hospitality suite without requiring major structural alterations.

If you're inheriting an existing executive box, hospitality suite or commercial space that no longer reflects your business, a targeted refurbishment can often deliver a significant improvement while making the most of the existing shell.

BEFORE

Where we started.

The executive box before refurbishment
Drop a second before shot
Drop a third before shot
AFTER

The finished space.

Colour-drenched seating area Modular seating and pouffes View across the refurbished suite Bar stools at the breakfast bar Feature wall lighting detail High table with plush bar stools
SERVICES DELIVERED

One team, several specialisms.

This project combined several of our specialist services. Explore them on our Design, Build and Furnish pages.

> Commercial interior design
> Space planning
> Bespoke joinery and storage solutions
> Partitioning and built-in storage
> Feature wall panelling
> Decorative and LED lighting installation
> Furniture specification, supply and installation
> Commercial decorating and finishing

Have a similar project?

Whether you're refurbishing an executive box, hospitality suite, office or commercial interior, we can help you create a space that reflects your brand and works harder for your business.

If you're planning a refurbishment in Doncaster or anywhere across the UK, get in touch for an initial conversation and a no-obligation quotation.

Ready to transform your space? Contact District Four Design today to discuss your project.

Discuss your project View all projects

The result is a space that we're blown away by. The staff are all over the moon and what had become a tired office environment is now a very modern, uplifting place to work. It's fantastic to hear our employees' positive feedback and see them making great use of the new break-out zones, too.

TAYLOR STEVENSON

FAQS

Frequently asked questions.

How much does an executive box refurbishment cost?+

Every project is different, but smaller hospitality refurbishments like this one typically fall below £20,000 depending on the scope of works, furniture specification and lighting requirements.

Can you refurbish a hospitality suite without replacing everything?+

Yes. In many cases we retain suitable existing elements and design around them where it makes commercial and aesthetic sense. In this project, we worked with the existing flooring to achieve a high-quality finish while avoiding unnecessary replacement.

How long does a hospitality refurbishment take?+

Projects vary depending on procurement and scope, but this refurbishment took approximately three weeks from start to completion, including furniture procurement, with around two weeks on site for the build.

Can you complete work during the football off-season?+

Yes. We regularly programme commercial refurbishment projects around operational requirements and deadlines to minimise disruption and ensure spaces are ready for reopening or new seasons.